Будимпекс Ф  
ОБОРУДОВАНИЕ ДЛЯ ПРОИЗВОДСТВА ПАНЕЛЕЙ-СЭНДВИЧ
 
 
Automatic line for production of profiles "KNAUF" type

1. EQUIPMENT SPECIFICATION

Title Model

Quantity,
pcs.

Weight,
kg .
Size,
mm.
Price,
EUR
1 De-coiling barrel (duble-side) with reel brake without actuator RBK-2R/350/09 1 550 1500x1200x1500  
2 Directing device   1 25 600х400х300  
3

Double steel forming machine (8 mills)

PR-2R-8/09 1 1800 2970х800х1300  
4 Sets of steel forming rolls:
- Type - 1
- Type - 2
- Type - 3, 4, 5  (universal)
- Type - 6, 7, 8  (universal)
- Type – 9
 
1 set
1 set
1 set
1 set
1 set

120
120
120
120
120
   
5 Automatic guillotine with actuator NGR-350/09 2 180 450х200х500  
6 Sets of changeable knives for guillotine for prifiles:
Type – 1
Type – 2
Type – 3
Type – 4
Type – 5
Type – 6
Type – 7
Type – 8
Type – 9
 
2
2
2
2
2
2
2
2
2

4
4
4
4
4
4
4
4
4
   
 
TOTAL: *  

 

2. EQUIPMENT DESCRIPTION AND POSSIBLE TIPES OF PROFILES

The equipment set is designed for simultaneous forming of 2 types of profiles. It is possible also to produce only one type. Double-side de-coiling barrel provides installation of 2 types of rolled steel simultaneous. Steel forming machine provides parallel forming of 2 types of profiles (from one actuator) simultaneous.

The equipment set is designed for production of different types of profiles KNAUF-type:

профиль KNAUF тип 1

 

 

Profile type 1

профиль KNAUF тип 2

 

 

Profile type 2

профиль KNAUF тип 3

 

 

Profile type 3, 4 и 5 width 50mm, 75mm и 100mm

профиль KNAUF тип 6

 

 

Profile type 6, 7 и 8 width 50mm, 75mm и 100mm

профиль KNAUF тип 9

 

 

Profile type 9

All necessary technical, operation and service documentation is supplied with equipment (on paper and electronic media).

 

3. EQUIPMENT INSTALLATION

Installation, mounting, adjustment and starting of equipment is made by the supplier. Training is provided by supplier during installation.

Required personnel - 2
Installation - 2 working days
Mounting and adjustment - 3 working days

Installation, mounting and adjustment - **** EUR

 

4. COMMERCIAL TERMS

Production period - 4,5 months

Terms of payment:

  • Prepayment before production - 40%
  • Payment - 55%
  • Final payment before delivery- 5%

Terms of delivery - EXW, Oborniki, Poland