System of modules D1
module D1 and its use
System of modules K6
module K6 and its use
System of modules ZS1
module ZS1 and its use
Equipment set #2 (2000)
work of equipment line
Equipment set #2 (at Tula)
manual glueing, steel forming, sandwich panels assembly, pressing in manual screw press
Equipment set #3
work of equipment line with roller-type thermo-press
Manual glueing
manual glueing, pressing of sandwich panels in screw press
Automatic glueing
work of glueing machine, pressing of sandwich panels in screw press
Automatic glueing of PVC-panels
work of automatic glueing machine
Production of PVC-panels
production of PVC panels in 6-meters length glueing machine with rolls for preliminery pressing; pressing in screw press
Facade cassettes production (K-100 and K-200 "Liberta"-type)
production of facade cassettes: all operations are shown
Metal-tile production
work of steel forming line and other equipment for metal-tile production
Steel forming machine assembling
main operations of assembling are shown
PVC-panel side cutting
cutting machine with cutting band, movable board, sliding bed and pneumatic clips
Mineral wool cutting to lamels on SCWR-1.2/03 machine
fretsaw-type cutting machine with manual delivery of mineral wool
Steel cutting on URM-1250.05.8/05 machine
Steel cutitng machine with roll-knives and automatic delivery of steel